Gafgafa
Status
Under Construction
Project Type
Infrastructure
Project Area
25 KM
Commencement date
7-2025

Project description
This strategic concrete project in Al-Jafjafa strengthens our position as a leader in infrastructure by providing an integrated network that delivers water to the industrial complex in North Sinai. This project contributes to industrial and economic development and attracts investment.
Through these achievements, On Crete reaffirms its commitment to building strong infrastructure that supports investment, creates job opportunities, and promotes sustainable development for the communities of North Sinai.
Key Details
- Location: Sinai
- pipe network consists : 25 KM
- Excavation and installation at depths of : 3–7 meters
- Facilities : 10 concrete chambers are equipped for washing, ventilation, and valves.
- There are 28 tunnel and open crossings, each 50–75 m long
Equipment quality
Material
high-quality HDPE
diameter
710 mm