Al-Mosheer Axis
Status
Under Construction
Project Type
Infrastructure
Project Area
1300 m²
Commencement date
7-2025

Project description
Our unique project is more than just infrastructure; it represents a quantum leap in sewage services. The project will support urban expansion to the north and south of the Al-Mushir Tantawi Axis, improving living standards and promoting sustainable urban growth.
The project consists of:
– The slope line on the Martyr Axis, extending 1,300 meters with complex excavation reaching up to 12 meters and the installation of UPVC and reinforced concrete pipes to ensure maximum efficiency;
The discharge line on the Marshal Mohamed Ali Fahmy Axis is 2,500 meters long and crosses difficult mountainous terrain. It uses high-strength concrete pipes with a diameter of 1,000 mm.
Massive engineering works: More than 700,000 cubic meters of excavation and cutting were required, and 20 manholes, washing chambers, and an air chamber were constructed to support the system’s efficiency and sustainability.
Through this project, On crete continues to solidify its position as a reliable partner in creating a more sustainable and higher-quality urban future.
Key Details
- Location: Al-Mosheer Axis
- Total Built-Up Area:1300 m²
Equipment quality
Material
high-quality HDPE
diameter
710 mm